The project involves the construction of a built median strip, the formation of roundabouts, and the construction of sidewalks along Kolonakiou Avenue (Agios Athanasios) and Spyrou Kyprianou Avenue (Germasogeia). It also includes road resurfacing and maintenance, as well as the supply, installation, and operation of new traffic lights and Pelican-type signal-controlled pedestrian crossings.